Emerson Creek Transmission Line

Capture1.JPG

Name: Emerson Creek Transmission Line
Condemning Authority: Firelands Wind, LLC
OPSB Case No.: 19-1073-EL-BTX
County: Huron and Erie
Description: Firelands Wind, LLC plans to construct an 8.7-mile long electric transmission line and a point of interconnection switchyard to deliver power generated by the proposed Emerson Creek Wind Farm to the electric transmission grid. The transmission line would be located in Oxford, Lyme, and Ridgefield townships. The switchyard would be located along the American Transmission Systems Inc. (ATSI) 345 kV Beaver-Davis Besse circuit.

Project OPSB Docket

Previous

Reconstruction and Widening of I-75

Next

Construction of a New Interchange at I-475 and US-20A